The Center Ice Arena project came in way over budget on the initial bid. Durst worked with the project engineer and its prime vendors to save the owner over 100k in the roof structure design. We were able to design a Clear-Span two piece steel girders to act as the main supports for the structure. This meant no steel columns to interfere with the rink or areas surrounding the rink. It kept good clear sight lines throughout the building. The project was completed on time and below budget. The Durst team redesigned the entire roof structure and met the owners construction schedule.